For example, the National Climate Change Action Plan was developed in Kenya, the regional NDC Finance Initiative for the Caribbean was established, and Pakistan’s Ministry of Climate Change was strengthened. To support developing countries and emerging economies in achieving their climate goals in line with the Sustainable Development Goals of the 2030 Agenda, the German Federal Ministry for Economic Cooperation and Development (BMZ) and the German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU), together with other partners, launched the global NDC Partnership in 2016.įrom 2016 to 2020, the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH supported selected members of the NDC Partnership in their efforts to implement their NDCs and, since 2019, to make them more ambitious. The Paris Agreement also aims to align public and private financial flows with low-emission and climate-resilient development. To this end, the parties have pledged to develop their own Nationally Determined Contributions (NDCs), implement them and progressively make them more ambitious. By adopting the Paris Agreement in 2015, almost all the countries in the world committed to acting together for the first time: Their aim is to limit global warming to well below 2 ☌, if possible to 1.5 ☌, and to adapt to the consequences of climate change. Gillenwater and Associates Evans-Mactavish-Agricraft Sherwin Williams Jefferson/Lightsmith Dare Concrete Electric Motor and Contracting Associated Scaffolding Albemarle Fence Stone Buff RSC Rentals Sunbelt Rentals Graybar Rexell A&A Atlantic Action Mobile Industries Coastal Ready Mix Ace Hardware and Home Depot.Climate change is one of the greatest challenges of our time. Vendors and Services were provided by: Outer Banks Glass Kitty Hawk Iron and Steel Works Precision Pipe Solutions Alldredge Plumbing Mr. Other contractors included: Carolina Restoration and Waterproofing Memorial Design and Sales and R.A. Watson Electrical Construction Company of Chesapeake was the general contractor for the job with oversight provided by Moser Mayer Phoenix Associates of Greensboro. ![]() "This has been an exciting legacy project at Wright Brothers," he said earlier this week.įunding for the restoration was provided by the First Flight Foundation. She now stands tall for the nearly 500,000 annual national and international visitors to see," stated John Harris. ![]() "We had the very best of the best experts with experience in historic restorations working side by side to complete a project with passion and excellence. John Harris, First Flight Foundation President, is pleased with the team who performed the restoration work. The dome and beacon at the top of the monument, 161 feet above sea level, were also cleaned and reworked for maximum efficiency. A new lighting scheme mirroring the historically documented version highlights the beautifully carved Mount Airy (NC) Granite "wings" at night. The monument restoration started on Decem(the day after the 104 th anniversary of the first heavier than air powered flight) and included cleaning the interior and exterior of the granite pylon, repointing the exterior mortar, painting the stairs as well as renovation of the electrical and mechanical systems. "Now that the work is completed, the NPS will once again be able to provide visitors with opportunities to access the monument’s observation platform, which last occurred in 1993." ![]() "Through the initiative and support of the First Flight Foundation, the monument has been restored to first-class condition and the underlying moisture issues that were causing its deterioration have been corrected," said Murray as he thanked the Foundation for its efforts to preserve the nations’ air heritage. ![]() Superintendent Murray invites the public to join in the celebration, which recognizes the first facelift the monument has received in over a decade. To celebrate the completion of the project, the First Flight Foundation and the Outer Banks Chamber of Commerce will co-sponsor a ribbon cutting event at Wright Brothers National Memorial on June 25 at 10 a.m., followed by an opportunity for visitors to climb to the top of the monument on a first-come, first-served basis. Superintendent Mike Murray announced today that the renovation of the monument at Wright Brothers National Memorial has been completed thanks to the outstanding efforts of the First Flight Foundation, a key partner of the National Park Service (NPS) at the National Memorial.
0 Comments
Leave a Reply. |